Laserfiche WebLink
Monitoring System Certification <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section mast be completed if in -taunt gauging equipment is used to perfon n leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing.for ground faults? <br />❑ Yes <br />Cl NO <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly?:" r" t € <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />f"'nmr.]A+. thn fnl1nm MIPPlrllef. <br />I <br />0 -Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: %0 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />f -Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />t6—Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />4—Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />+ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />- N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the, monitoring system is disabled <br />k!kN/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />&2:_N/A <br />or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />NIA <br />Xes <br />I ❑ No* <br />J Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />UN -036 — 5/6 <br />C_ C_ <br />Page 3 of 4 <br />w mmuldoes.org <br />Rev. 01/17/08 <br />