Laserfiche WebLink
Monitoring System Certification <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following cheeldist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing.for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? { <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected, <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />f"....,.,IeFo fr.o C.,IF.,�.Urnn n6.nn8rlie4• <br />ja Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak shmrlated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: 9-3 g.p.h.; ❑ 0.1 g.p.lr ; [10.2 g.p.h. <br />Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />O -Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />t9 -Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the, monitoring system is disabled <br />CO N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />V,NIA <br />or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />/A <br />X -Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />t <br />H. Comments: 9,e6\ GLeA Red Jai LLD on Le-igA ` <br />Page 3 of 4 <br />UN -036 -- S/6 www.anldoes. org Rev. 01/17/08 <br />