Laserfiche WebLink
Monitoring System Certification <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inve t ry control. <br />❑ Check this box if no tank gauging or SIR equipmen sllkd20l6 <br />This section trust be completed if in -tank gauging equipment is used to perform leak detection monit off, <br />Complete the following checklist: , V, .a._ <br />® Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />19 Yes <br />Q No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />® Yes ❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />--- --- -- -•,--�•....� .•wde,e,e ­Axett wilcii tiirbc uciit:tcncIcs were or wlii De correcteo. <br />G. Line Leak Detectors (LLD): <br />('mmnleto tlia fnllntvina nh^oW;.t. <br />❑ Check this box if LLDs are not installed. <br />[Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />[]---N/A <br />(Check all ihert apple) Simulated leak rate: E 3 g.p.h.; ❑ 0.1 g.p.h ; [10.2 g.p.h. <br />Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Q. Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs. does the turbine automatically shut off if any portion of the monitoring system is disabled <br />NIA <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LI,Ds, does the turbine automatically shut off if any portion of the monitoring system <br />Cj,N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N!A <br />[ Yes <br />0 No <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- in the section rt, Deiow, ctescrioe now and when these deficiencies were or will be corrected. <br />H. Comments: <br />