My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No. 0519 P. 4 <br />U IF Ir 1. <br />n- an Vauging i SAX Equipment: EJ Check this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist! <br />0 Yes 0 No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />0 Yes 11 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />�Yes [5 No* Was accuracy of system product level readings tested? <br />0 Yes 0 No* Was accuracy of system water level readings tested? <br />Yes ❑ Ne Were all probes reinstalled properly? <br />JUL 3 0 2015 <br />0 Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Live Leak Detectors (LLD); El Check this box if LLI)s are not installed. <br />R, "Kvwj U1;3UX Jut! IRUW Una wnen mese Oellcienctes were or will be corrected. <br />H. CoMments: REPLACE DlEsr=L RED JACKEI M/N MOM LLD SIN 40114 AND EJET I <br />Page 3 of 4 <br />IIN-036 — 516 www.unidoes.org Rev. 01/17M <br />
The URL can be used to link to this page
Your browser does not support the video tag.