Laserfiche WebLink
Comments: <br />SB -989 testing is due ,7ext month. <br />ANNUAL: EMl'l_C�_�.=.1 TRAlN1.N(," 1�'F TDAY, UNE 6111 r& 9:OOAML HAVE ALL EMPLOYEES <br />C?� SITE. .�. _ ,_...� <br />Alarms in elle J7a l� <br />Tank 1 high produ , 04 (l. <br />L1: unl STP surra,) 0 ,;, <br />L4: diesel STP St.=„ 05/04. <br />Ll was repaired by 1,,,C Services. <br />I,=1was repaired bV 1 T.„,Ac <br />Items Requiring EtAlo%v-Up Actions: <br />Instructions: <br />Monthly visual irsrc:_ti4 n of the UST systcm must be conducted by a Designated UST Operator, who <br />possesses a c.urre.r t CJST Sy sten Operator” certification issued by the International Code <br />Council. <br />A copy of this vseal inspection checklist must be, provided to the UST Owner or Operator, but <br />riot to the. State C'or1°rol Board. <br />+I -lie Designated US . OAerator must falcrt the UST Owner or Operator of any condition discovered during <br />the monthly v isu al ., <° ti4}n that may require f011OW-cap actions. <br />The UST Okvner ot, ()[ ° ator must maintain ain a copy of this monthly visual inspection checklist and all <br />attachments for t?ie ;its 12 niontl­�. "rhe records maist be maintained on-site or, if approved by the <br />local agency. oil= r—idilti� avail:i!,1 location. <br />Page 2 of 2 <br />