Laserfiche WebLink
w <br />MOO itoring System Certification <br />NOV I, 2013 <br />F. In -,Tank Ganging / SfR Eqj�jpnient; M Check this box if tank gauging T L <br />r I <br />0 Check this box if no tar& SIR Whipmei t 1! iiista 1� <br />gaui iro $1 U it WIS insta wl� <br />This section must be completed if in -tank gauging equipment is used to perform leak deteetion monitoring. <br />Complete the following checMt-. <br />Was accuracy of system product level readings tested? <br />W83 11c-MraCY Of System water level readings tested? <br />MEM <br />'Were Q items oil the equipment manufacturer's maintenance checklist completed? <br />21 <br />G. Line Leak Detectors (LLD): <br />Camnt.pto- tha _k—uu­ <br />H. Comments: I <br />Page 3 of 4 <br />Mw - 5/6 www-rxW4oc&org Rcv-011MV$ <br />Were all LL -Ds confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus properly calibrated? <br />for mechwical LLDs, —doe; die, LLD �re_stnctproduct f low- If —it d etects a leak? <br />Turvine automatfcalr� shut Olt if the LLD detects a leak? <br />Now <br />MW#Dff eRIMMIM W" "WRIT'P, 10-57,39 wo W&T ov*le mowtormg system is alsab <br />IL n-I;F Portion n"J <br />Ii <br />or disconnected? <br />y <br />or fails a test? <br />i For electronic LLDs, have all accessible Wiring connections been visually inspected? <br />1010 <br />ore all items On the equipment manufacturer's maintenance checklist completed? <br />ow"ff "S <br />H. Comments: I <br />Page 3 of 4 <br />Mw - 5/6 www-rxW4oc&org Rcv-011MV$ <br />