My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> 0 is <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> El Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> • Yes E] No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> • Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ED Yes El No* Was accuracy of system product level readings tested? <br /> • Yes 1171 No* Was accuracy of system water level readings tested? <br /> • Yes Ej No* Were all probes reinstalled properly? <br /> • Yes 171 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): E] Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> 0 Yes 0 No* For equipment start-up or annual equipment certification, was a leak simulated to verify, LLD performance? 11 <br /> El N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.: El 0.1 g.p.h ; El 0.2 g.p.h. <br /> [D Yes 1-1 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> • Yes [] No* Was the testing apparatus properly calibrated? <br /> • Yes Fj No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> El N/A <br /> 171 Yes n No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> El Yes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> E] Yes 171 N For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> 0 N/A or fails a test? <br /> F1 Yes F1 No* For electronic LLDs,have all accessible wiring connections been Visually inspected? <br /> 0 N/A <br /> Z Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 4 <br /> UN-036—5/6 wwwain1does.org Rev.01117/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.