Laserfiche WebLink
[ ] 1. Submit all information in triplicate. Answer all questions, leaving no blanks, One copy will be returned to the <br />applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper showing all work to be done, Include the location of <br />the tanks(s), piping, all tank,related appprtenenop$, streets, adjacent properties (north toward the top of the page), <br />nearby septic tanks, leachfieids, water wells, buildings, underground public utility lines (including water, sanitary <br />sewer and storm sewer), and distance of piping from tank to d1wansers. if underground utilities are not included <br />on the site map, you must state in writing that U6A 019 will be contacted prior to excavation activities. <br />[] 3. Complete pages - , "APPLICATION FFR UNDaROROUND STORAC,E TANK RETROFIT OR PIPING <br />REPAIR PERIVIM. N0T : if samolima is required. eamplimca firm shall be an independent third nsrty from the <br />[ ] 4. Complete page 7, "AuthorE�:ation to Release". This form must be signed and dated by the <br />OWNER10PERATOR of the fadlity. <br />[ l 5. Submit a completed "Service Request" form and "Underground Storage Tank Program Fee Workshest", <br />[ ] 6. If performing any excavation activities, and the facility Is located outside of the city limits, submit a "Backfill <br />Excavation CertMests" . as required by the San Joaquin County Building Department. If a '1jackflll ExCaVs3tlQh <br />Certlflcate" is required by any Incorporated areas (cities), submit to the appropriate City Building Departments, <br />pursuant to the uniform Building Code STIP 70-11. <br />[ ] 7. The maximum review time for Plan Review Is 15 working days from receipt of the adagu v.comoleted Rlan. If <br />gross deficiencies are Identified, an addendum will be required with a $125.00 per hour fee and'the review will <br />begin on the date of resubmittal. <br />] a. Advpnce inspection notice of at least 4$ houM is required by the Environmental Health <br />Department (EHD). <br />[ ] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the. tower Explosive Limit (LEL) <br />atmosphere and oxygen level), adequate number(s) and appropriate type(e) of fire extinguisher(s), and barriers to <br />secure the area as necessary to minimize traffic and pedestrian interference. It shall be, the project managers <br />responsibility for compliance with all health & safety regulations and requirements, including confined space <br />requirements, which shall by strictly adhered to at all tirnes during the course of the underground storage tank <br />(UST) activities. <br />[ ] 10. The EHO permit shall be on site during ,all UST permit -related activities. <br />] 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any work <br />must be described in detail on pages 3 & 4 and be shown on the detailed site map. <br />0 <br />San Joaquin County <br />Environmental Health Department <br />DIRECTOR <br />1868 E, Hazelton Avenue <br />Donna Heron, REHS <br />Stockton, California 65205-6232 <br />PROGRAM COORDINATORS <br />l'�tOatt <br />Ropert MaClellon, RENS <br />Jeff Carruesco, REFI$, RDI <br />Website: wrww.sjgov.org/ohd <br />Kasey Foley, RENS <br />Linda Turkatte, RENS <br />Phone: (2091) 4684420 <br />Fant: (209) 464-3433 <br />[ ] 1. Submit all information in triplicate. Answer all questions, leaving no blanks, One copy will be returned to the <br />applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper showing all work to be done, Include the location of <br />the tanks(s), piping, all tank,related appprtenenop$, streets, adjacent properties (north toward the top of the page), <br />nearby septic tanks, leachfieids, water wells, buildings, underground public utility lines (including water, sanitary <br />sewer and storm sewer), and distance of piping from tank to d1wansers. if underground utilities are not included <br />on the site map, you must state in writing that U6A 019 will be contacted prior to excavation activities. <br />[] 3. Complete pages - , "APPLICATION FFR UNDaROROUND STORAC,E TANK RETROFIT OR PIPING <br />REPAIR PERIVIM. N0T : if samolima is required. eamplimca firm shall be an independent third nsrty from the <br />[ ] 4. Complete page 7, "AuthorE�:ation to Release". This form must be signed and dated by the <br />OWNER10PERATOR of the fadlity. <br />[ l 5. Submit a completed "Service Request" form and "Underground Storage Tank Program Fee Workshest", <br />[ ] 6. If performing any excavation activities, and the facility Is located outside of the city limits, submit a "Backfill <br />Excavation CertMests" . as required by the San Joaquin County Building Department. If a '1jackflll ExCaVs3tlQh <br />Certlflcate" is required by any Incorporated areas (cities), submit to the appropriate City Building Departments, <br />pursuant to the uniform Building Code STIP 70-11. <br />[ ] 7. The maximum review time for Plan Review Is 15 working days from receipt of the adagu v.comoleted Rlan. If <br />gross deficiencies are Identified, an addendum will be required with a $125.00 per hour fee and'the review will <br />begin on the date of resubmittal. <br />] a. Advpnce inspection notice of at least 4$ houM is required by the Environmental Health <br />Department (EHD). <br />[ ] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the. tower Explosive Limit (LEL) <br />atmosphere and oxygen level), adequate number(s) and appropriate type(e) of fire extinguisher(s), and barriers to <br />secure the area as necessary to minimize traffic and pedestrian interference. It shall be, the project managers <br />responsibility for compliance with all health & safety regulations and requirements, including confined space <br />requirements, which shall by strictly adhered to at all tirnes during the course of the underground storage tank <br />(UST) activities. <br />[ ] 10. The EHO permit shall be on site during ,all UST permit -related activities. <br />] 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any work <br />must be described in detail on pages 3 & 4 and be shown on the detailed site map. <br />0 <br />