My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ED <br /> UST SYSTEM RETROFIT OR REPAIR AUG 0 6 21 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained b <br /> 1, Site map enclosed? YnF-j NO E 1, L LT <br /> 2. Submit copies or Icc Service Technician and/or Installer's certificate and all manufacturer training certificates:for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy or the"Site Health and, Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done, (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installatibn Application <br /> pages 4-8 as necessary for a timely plan review): <br /> replace direct bury bucket on 87 tank;excavation required <br /> 4. List of equipment to be used(Attach manufacturer's spec cation sheets showing third-party approval): <br /> Phil-tite Defender 705-550 Series(705-555101-CI-GKT) <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.