Laserfiche WebLink
SWRC9.JalivakY -2002 <br /> Page 3 of 7 <br /> Job: tips <br /> 1531 N, <br /> Sti)ektotij CA 09205 <br /> nate: May 9,1009 <br /> S. SECONDARY PIPE TESTING Standard Professional <br /> Test Nfietho <br /> Developed By: Piping manufacturer [XI industry <br /> Engibeet Other(Specify) Vacuum Hydrostatic <br /> Test Method Used; [X]Pressure [ ]Other(Specify) <br /> F— <br /> TFqu!pment Resolution: 010,tst���sftm Ga,ugc <br /> Piping Run piping Run Piping Run Piping Run Piping Ran <br /> _E!RLitig Material: , _ Ili <br /> bex less <br /> _t!g±g Manufacturer: A.0.Siftith <br /> 3 Web <br /> Lon h of Piping Rtifl: 3.2 feet <br /> Product Stated*. , Diesel <br /> Method and location of Test Boot <br /> oioinjL-run isolWoh: Turbine Sump <br /> Wait.tithe between applying <br /> pmsgure/vacuuIiI/Wht&and <br /> starting test: <br /> Test Start Tithe: 9!00 a.m. <br /> initial Road Llg-ff!2- <br /> Teft End Time: 10,00 A.m. <br /> FinaLR�din (LtQ: 5 asci. <br /> Test Duration: . .1 hour <br /> Chari e inReadifig(RPRI) <br /> Pass/Fail Threshold or <br /> Criteria: <br /> 4 Fail <br /> P110 H F-PA <br /> LINI_rI VA." <br /> Cowiftenft–(include ii1fortfiatiott on repairs made Prior to testing,and recommended Ntow-up,for failed tests) <br />