Laserfiche WebLink
T • ! FILE COPY <br /> San Joaquin County DIRECTOR <br /> PQ i N Donna Heran,REHS <br /> Environmental Health Department ASSISTANT DIRECTOR <br /> 600 East Main Street Laurie Cotulla, REHS <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> .. `. <br /> Carl Borgman,REHS <br /> C. �P 19 . /ehd <br /> Website: www.s ovor Mike Huggins,REHS, RDI <br /> q F o.R�a 9 Margaret Lagorio,REHS <br /> Phone: (209)468-3420 Robert McClellon, REHS <br /> Fax: (209)464-0138 ,teff Carruesco, REHS, RDI <br /> Kasey Foley, REHS <br /> October 16, 2008 <br /> Mike Flores <br /> Stockton Service Station Eq. Co. <br /> P.O.Box 508 <br /> Stockton,CA 95201 <br /> Fax: (209)464-8349 SENT VIA FAX <br /> Re: United Parcel Service, 1532 N.Broadway, Stockton(SR0055637) <br /> The San Joaquin County Environmental Health Department(EHD)has reviewed the <br /> application for permit (SR0055637)to explore the failure of the secondary containment test in <br /> July 2008. The application proposed breaking out the concrete at the Bravo under dispenser <br /> containment to evaluate the problem and determine the best repair option. Addendum covering <br /> the scope of work that will repair the system and certification from the manufacturer of any <br /> components shall be submitted to EHD after the problem has been identified. This permit has <br /> been approved with the following conditions. <br /> Conditions of approval: <br /> 1. Contact the local Fire Department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits. <br /> 2. Any changes shall be submitted to the San Joaquin County Environmental Health <br /> Department(EHD) for approval prior to commencing work. All new addenda supercede <br /> the previous ones. <br /> 3. All components must be certified by an independent testing organization. (UL,ULC, <br /> ANSI, API, ASTM, etc. See California Code of Regulations(CCR),Title 23 Chapter 16 <br /> Table B for complete list). The component must bear the appropriate mark as required by <br /> the independent testing organization. <br /> 4. If concrete is broken near the UST, a tank integrity test and/or line integrity test(or <br /> equivalent)must be performed,once concrete is poured in accordance with the <br /> manufacturer's guidelines.Results must be received by EHD within seven days of <br /> returning the facility to operating condition. <br /> 5. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br />