Laserfiche WebLink
UPS Fuel Drop Cercation Checklist <br />Name: <br />Position: <br />INITIAIJS <br />1. Daily Fuel Inventory Procedures 01 -- <br />II. Receiving the Driver <br />A. UPS Representation <br />1 oil Spill Contingency Plan <br />B. Verification of Tanker Volume and Product <br />Ill. Verifying the Tank Ullage <br />A. Monitoring Console <br />B. Ullage Definition <br />IV. Receiving the Fuel <br />A. UPS Representation <br />B. Manhole identification <br />C. Delivery & Vapor Recovery Hose Connection <br />D. Overfill Prevention Valve <br />E. visual Product Delivery Confirmation <br />F. Proper Hose Disconnection <br />V. Fuel Delivery Reconciliation <br />A. Delivery Volume Confirmation <br />B. Delivery Reconciliation <br />C. Completion of Fuel Drop Information <br />VI. Removal of Water <br />A. Water Removal <br />B. Reconciliation of Fuel and Water <br />VII. Alternate Inventory Verification Procedure <br />A. Tank Metering Stick - Metho*and Maintenance <br />VIII. Fuel Drop Video <br />Trainee Signature: <br />Trainer: <br />Title: <br />Date: 2— <br />cc: Employee History Pro Ale (EHP code 0194) <br />Page 13 <br />