My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_1997-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:44:18 PM
Creation date
6/23/2020 6:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2012
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231522_1532 N BROADWAY_1997-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UP$ Fuel Drop Certification Checklist <br />Name: <br />Position: K 4.1�1 Ul <br />INIT!:N-S <br />yjl <br />a <br />w <br />ME <br />Daily Fuel Inventory Procedures <br />Receiving the Driver <br />A. UPS Representation <br />1. it Spill Contingency Plan <br />B. Verification of Tanker Volume and Product <br />Verifying the Tank Ullage <br />A. Monitoring Console <br />B. Ullage Definition <br />Receiving the Fuel <br />A. UPS Representation <br />B. Manhole Identification <br />C. Delivery & Vapor Recovety Hose Connection <br />D. overfill Prevention Valve <br />E. Visual product Delivefy Confirmation <br />F. Proper Hose Disconnection <br />Fuel Delivery Reconciliation <br />A. Delivery Volume Confirmation <br />B. Delivery Reconciliation <br />C. Completion of Fuel Drop Information <br />Removal of Water <br />A. Water Removal <br />B. Reconciliation of Fuel and Water <br />Alternate Inventory Verification Procedure <br />A. Tank Metering Stick - Method and Maintenance <br />Vill. Fuel rop Video <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.