My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_1997-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:44:18 PM
Creation date
6/23/2020 6:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2012
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231522_1532 N BROADWAY_1997-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQIWOUNTY ENVIRONMENTAL HEALTHIVARTMENT <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 2 <br />VI. DISPENSER MONITORING <br />ITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) M50. <br />VMO <br />I� ' CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) _ <br />Ms 1. O� �J — zZ M5Z' <br />PANEL MANUFACTURER: MODEL #: ldC?—t� <br />LEAK SENSOR MANUFACTURER: _ Z x— M53. MODEL #(S): I Msa. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a. YES 93"b. NO m". <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? [17f a. YES ❑ b. NO M56. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? M_ a. YES ❑ b. NO M57. <br />❑ 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />ASSEMBLY MANUFACTURER: Mss. MODEL #(S): M59. <br />❑ 3.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requires agency approval) M60. <br />❑ 4. NO DISPENSERS <br />❑ 99. OTHER (Specify) M61. <br />VII. ENHANCED LEAK DETECTION <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />REFS NCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) M80. <br />1. [THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 1/01/2005) <br />4. Yd CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify): Mgt' <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br />By January 1, 2005 this facility will have a "Designated UST Operator" who has passed the operator exam administered by the International Code Council (ICC). By <br />January 1, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems. <br />This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />➢ The facility employee's role with regard to spills and overfills. <br />➢ Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after January 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />Please use this section to include any additional UST system monitoring -related information (e.g., additional information required by your local agency):, M85. <br />^��-t�(11� '�C—� ������ L lStsAP� <br />TYPE OF OVERFILL PREVENTION=�� e�•L� v�}�-C�, <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF 1/1/05, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION — <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 2715(b). <br />XI. OWNER/OPERATOR SIGNATURE <br />CERTIFIC : I certify that the information provided herein is true and accurate to the best of my knowledge. <br />SIGNATURE REPRESENTING <br />DATE: M91. <br />=PE <br />er M90. <br />56perator <br />-7 <br />O R/O E TOR NAME (print): M92. <br />OWNER/OPERATOR TITLE: M93. <br />(Agency Use Only) This plan has been reviewed and: ❑ Approved With Conditions Disapproved <br />kpproved <br />Local Agency Signature: Date: <br />Comments/Special Condi tons: <br />SJCEHD-d (07/03) - 3/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.