My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_1997-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:44:18 PM
Creation date
6/23/2020 6:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2012
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231522_1532 N BROADWAY_1997-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sagov.org/ehd/unitiii.htmi <br /> CONTINUATION FORM Page: 3 of 3 <br /> OFFICIALDate: 06/15/10 <br /> Facility Address: 1532 N. Broadway Program: UST <br /> SUMMARY OF VIOLATIONS <br /> CLASS I CLASS H or MINOR-Notice to Com <br /> This is a routine UST inspection on June 15, 2010. This inspection report has been revised on June 17, <br /> 2010 (in color green). Following is the summary of violations: <br /> 5. Monthly testing of the monitoring system during the Designated Operator monthly inspection is not <br /> written in the Monitoring Plan. <br /> Owners or operators of underground storage tanks subject shall implement a monitoring <br /> program approved by the local agency and specified in the underground storage tank operating permit. <br /> - Submit a copy of a current and accurate Monitoring Plan to EHD for approval by July 18, 2010. <br /> The Monitoring Plan should include description of the monthly monitoring system testing, and protocol <br /> for preserving the alarm history before the alarms are set off each month. <br /> Annual UST monitoring certification was witnessed during this inspection. Passed. <br /> Submit a copy of the technician's certification of manufacturer's training to this office within 24 hours. <br /> Please be aware that a current certification of manufacturer's training of the technician is required in <br /> order for this office to accept the annual UST monitoring certification conducted today. This office has <br /> received a copy of the technician's current Veeder-Root Level 4 Certification on June 16, 2010. <br /> The VMI line leak detector 99LD-2000 (LLD) successfully detected a 3 gallon per hour leak at 10 p.s.i. <br /> during this inspection. The tester equipment used has not been certified by VMI. Please be aware that <br /> VMI has adopted a program to evaluate and certify other line leak detection equipment not <br /> manufactured by VMI. <br /> http://www.vaporiess.com/vmi—website links/cert_technicians_old/tech_cert_toc.pdf <br /> ALL EHD STAFF TIME ASSOCIATED NTH FAILING TO COMPLY BY THE ABOVE NOTED DATES IMLL BE BILLED AT THE CURRENT HOURLY RATE($115). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By: Title: <br /> )?oto <br /> EHD 23-02-003 Rev /01/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.