Laserfiche WebLink
SWRC`B, January 2002 <br />Page of <br />8. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equi ed With S ill/overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: ] Spill Bucket N-ianufacturer E Industry Standard �7] Profession!Engineerl0 Other (Spec) <br />Test Method Used: ` Pressure ❑Vacuum ❑Hydrostati <br />❑ Other (Specify) <br />Test Equipment Used <br />r 3d Equipment Resolution <br />>,,,' �s3,,'�v'�� � 2�' w.-� •,a4->.,.., .,x,4,3 va..xFrrY.�rs fr<:,s.,. � - <br />=��k���'.�+aa�.��'������ : Spill Boa # Sill Boa # <br />Spill Spill Bog # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />startin test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result ~` ` ❑ Pass ❑ Faii <br />Q Pass:, ❑Fail ' . ❑ Passe ❑ Fail ❑Pass 0 Fail `. <br />Comments - (include is formation on repairs made Prior to testing, and recommended follow -u for ailed tests) <br />