Laserfiche WebLink
. 0 <br />D. Results of Testing/Servicing— <br />Software Version Installed: Z , C% 2 - <br />Complete the following checklist: <br />es <br />❑ No* <br />Is the audible alarm operational? <br />Yes <br />W <br />❑ No* <br />Is the visual alarm operational? <br />es <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />EJ Yes <br />El No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />❑ Yes <br />❑ o* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />N/A <br />operational? <br />Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate -or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) d' ump/Trench Sensors; EfDispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? Yes; ❑ No. <br />❑ Yes <br />O,lo* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />Ef N/A <br />mechanical overfill prevention. valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill and operating properly? If so, at what percent of tank capacity does the alarm trigger? <br />point(s) <br />C3 Yes* <br />El No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />No <br />as liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />Product; ❑ Water. If yes, describe causes. in Section E, below. <br />Yes <br />❑ No* <br />LWasmonitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />Ll Yes <br />❑ No* <br />all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will oe corrected. <br />E. Comments: <br />Page 2 of 3 03101 <br />