Laserfiche WebLink
F. In -Tank Gauging /SIR Equipment: <br />C] <br />CIT-J—ieck this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perfomi leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes I ❑ No* I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />0 <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section. H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Tete the following checklist: <br />es ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A I (Check all that apply) Simulated leak rate: [R5-g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />❑ Yes o* Were all LLDs confirmed operational and accurate within regulatory requirements? <br />es ❑ No* Was the testing apparatus properly calibrated? <br />❑ Yes o* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />O N/A <br />O Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />6 /A <br />❑Yes O No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />/A or disconnected? <br />O Yes ❑ o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />N/A malfunctions or fails a test? <br />O Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />O"ON/A <br />Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />