Laserfiche WebLink
, )ttYvare version Ij talled. <br /> Fon the following;checklist: <br /> rY ❑ No* Is the audible alarm operational? <br /> is ❑ No* Is the visual alarm operational? <br /> ❑ No"` Were all sensors visually ins ec d functionally tested,and confirmed operational? , <br /> ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that oher equipment will <br /> not interfere with their proper operation? <br /> ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ® N/A operational? <br /> ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) Sump/Trench Sensors; Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes, ❑No. <br /> ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what.percent of tank capacity does the alarm trigger? <br /> % <br /> es* M No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E, below. <br /> %❑ Yes* ER,-No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that app1j) <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below. <br /> 22 Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> Yes ❑ No* Is all monitoring equipment oerational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> 4 <br /> Page 2 of 3 03/01 <br /> s <br />