Laserfiche WebLink
Site Address:(9r~ "r—re'r-07,0�� _ Date of Testing/Servicing: &114114P <br /> F. In-Tank Gauging/SIR Equip nt: ieck this box if tank gauging is used only for inventorycontrol. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> El Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes F❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes 1 CI No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> El"Ve-s ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: g.p.h. ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> GRO'Ves ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es i_ ❑ No* Was the testing apparatus properly calibrated? <br /> es ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> U"MA <br /> 13 Yes El No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> /A or disconnected? <br /> ❑ Yes ❑ No* For electronic' LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> N/A malfunctions or fails a test? <br /> ❑ Yes No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />