Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 329.01 _ <br /> )m fete the followin checklist: <br /> FRYeNo* Is the audible alarm operational? <br /> No* Is the visual alarm operational? <br /> No* Were all sensors visually inspected,functionally tested, nd confirmed operational? <br /> No* Were all sensors installed at lowest point of secondarylcontainment and positioned so that other equipment will not interfere with their proper <br /> operation?No* If alarms are relayed to a remote monitoring station,is al communications equipment(e.g.,modem)operational? <br /> N/A <br /> ® Yes ❑ No* For pressurized piping systems,does the turbine autom tically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check a0 that apply) ® Sump/Trench <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and se sor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ® N/A installed),is the overfill warning alarm visible and audib a at the tank fill point(s)and operating properly? If so,at what percent of tank capacity <br /> does the alarm trigger? 0% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identi y specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes* ® No Was liquid found inside any secondary containment sys ems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Secti n E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes EEI No* Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. comments: INSPECTOR JEFF ON SITE <br /> Pa 2 of 4 2/21/07 <br /> Monitoring System Certification g <br />