My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4100
>
2300 - Underground Storage Tank Program
>
PR0231574
>
COMPLIANCE INFO_2005-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 11:53:40 AM
Creation date
6/23/2020 6:50:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2012
RECORD_ID
PR0231574
PE
2361
FACILITY_ID
FA0002123
FACILITY_NAME
GREWALS GAS & LIQUOR*
STREET_NUMBER
4100
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14333046
CURRENT_STATUS
01
SITE_LOCATION
4100 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231574_4100 E FREMONT_2005-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nov 1�9 09 03z2Gp Elite IV Contactors _ 12094616342 p. l <br /> 75� <br /> C � RLY <br /> UST SYSTEM'RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retain <br /> 4. Site map enclosed? YES[] ' NO[] -SAN JrJACaUN COUNTY <br /> V1*J€'JT 6 AL <br /> .2. Submit copies.of ICC Service Technician and/or Installer's certificate and all manufact es for each <br /> person.installing or testing'any companent'that is.repaired or replaced. Ensure a copy of the "Site Stealth and Safety <br /> Plan"is available on the]obsite as required by Title 8. <br /> 3; Detailed description of work to.be completed. List components-to.be repaired or replaced:and,attach a diagram drawn <br /> to scale showing location of.repairs andlor:replacements. If repairing a component,describe how.this Will'be-done..(if <br /> addin .piping; UDC's, or other UST equipment, or performing tank top.upgrade..use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review):' <br /> r , <br /> 4. List of-eq'uipfinent to be used(Attach manufacturer's specification sheets.showing third party approval): <br /> 2..: <br />
The URL can be used to link to this page
Your browser does not support the video tag.