My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4100
>
2300 - Underground Storage Tank Program
>
PR0231574
>
COMPLIANCE INFO_2005-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 11:53:40 AM
Creation date
6/23/2020 6:50:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2012
RECORD_ID
PR0231574
PE
2361
FACILITY_ID
FA0002123
FACILITY_NAME
GREWALS GAS & LIQUOR*
STREET_NUMBER
4100
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14333046
CURRENT_STATUS
01
SITE_LOCATION
4100 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231574_4100 E FREMONT_2005-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> In-Tank Gouging/SIR Equipment: 04 Check this box if tank gauging is used only for inventory control. <br /> U Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> @-,Yes U No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Lj" es Ll No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> L3 �X <br /> .4 es U No* Was accuracy of system product level readings tested? <br /> A <br /> t" Yes U No* Was accuracy of system water level readings tested? <br /> taNyes U No* Were all probes reinstalled properly? <br /> U Yes U No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> Com lets the following checklist: <br /> JR Yes U No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Ll N/A (Check all that apply) Simulated leak rate: 3 g.p.h.; U 0.1 g.p.h; Ll 0.2 g.p.h. <br /> IM Yes Ll No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Uk Yes Q No* Was the testing apparatus properly calibrated? <br /> M-Yes U No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Ll N/A <br /> Ll Yes U No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> A N/A <br /> Ll Yes 13 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> iq N/A or disconnected? <br /> U Yes U No* For electronic LLDs,does the turbine automatically shut off, if any portion of the monitoring system malfunctions <br /> 14 N/A or fails a test? <br /> 1 <br /> U Yes U No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Rk N/A <br /> Yes Ll No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments:' <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.