Laserfiche WebLink
0 <br /> In-Tank Gouging/SIR Equipment: 04 Check this box if tank gauging is used only for inventory control. <br /> U Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> @-,Yes U No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Lj" es Ll No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> L3 �X <br /> .4 es U No* Was accuracy of system product level readings tested? <br /> A <br /> t" Yes U No* Was accuracy of system water level readings tested? <br /> taNyes U No* Were all probes reinstalled properly? <br /> U Yes U No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> Com lets the following checklist: <br /> JR Yes U No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Ll N/A (Check all that apply) Simulated leak rate: 3 g.p.h.; U 0.1 g.p.h; Ll 0.2 g.p.h. <br /> IM Yes Ll No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Uk Yes Q No* Was the testing apparatus properly calibrated? <br /> M-Yes U No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Ll N/A <br /> Ll Yes U No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> A N/A <br /> Ll Yes 13 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> iq N/A or disconnected? <br /> U Yes U No* For electronic LLDs,does the turbine automatically shut off, if any portion of the monitoring system malfunctions <br /> 14 N/A or fails a test? <br /> 1 <br /> U Yes U No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Rk N/A <br /> Yes Ll No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments:' <br /> Page 3 of 3 03/01 <br />