Laserfiche WebLink
A <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard El Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 120' Approx. 140' Approx. 50' <br /> Product Stored: Regular 87 Super 91 Diesel <br /> Method and location of Test boot at Test boot at Test boot at STP <br /> piping-run isolation: UDC#5&6 UDC#5&6 Piping Sump#3 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> ressure and starting test: <br /> Test Start Time: 12:05 12:10 12:15 <br /> Initial Reading(Ri): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 1:05 1:10 1:15 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />