Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form JUN 10 2015 <br /> This form is intended for use by contractors performing annual testing of UST spill containmentur if ,be,completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for.submWal IQ tkt� OFR_1 t�gulgtory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name: GREWALS GAS Date of Testing: 4-12-2016 <br /> Facility Address: 4100 FREMONT ST STOCKTON C A <br /> Facility Contact: RICK Phone: <br /> Date Local Agency Was Notified of Testing :3-31-16 <br /> Name of Local Agency Inspector(if present during testing): CINDY <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 2"a Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑Lyle D.Nimmo ❑ Zane A.Nimmo ® David A.Winkler ❑ Felix G.Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ®Hydrostatic ❑Vacuum ❑Other <br /> Test Equipment Used: h20 and tape measure Equipment Resolution: 1/16 <br /> Identify Spill Bucket(By Tank 1 87 2 91 3 DSL 4 <br /> Number, Stored Product, etc. <br /> ®Direct Bury ®Direct Bury ®Direct Bury ❑Direct Bury <br /> Bucket Installation Type: ❑Contained in Sump ❑Contained in Sump ❑Contained in ❑ Contained in <br /> Sump Sum <br /> Bucket Diameter: 11 I 1 11 <br /> Bucket Depth: 11.25 12.50 15.25 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 9 9 9 <br /> Initial Reading(Rj): 11 11 14.50 <br /> Test End Time(TF): 10 10 10 <br /> Final Reading(RF): 11 11 14.50 <br /> Test Duration(TF—Tz): IHR IHR IHR <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or 1/16 1/16 1/16 <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date 4-12-2016 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />