Laserfiche WebLink
0 <br />:dEEPs< i6��_ 7ANKt Oct UL€ ' ��/ TANK MCL)EL/MATERIAL: k,�Xij <br />;APACITT: O�iv�v PRODUCT: b R. E. H. S:�v 4 <br />INITIAL INSPECTIONS <br />j�zl Gj� <br />A <br />I <br />INSPECTION AND TEST OF SECONDARY CONTAIMENT: HOLIDAY: <br />I <br />P <br />H <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />8. LAKE TEST ON ALL S.KPS (24 HR. KINIM.RS) HRS: (CCR 2635 (A)) <br />P <br />I <br />WITH KkWUFACTiRER WITTER SPECIFICATIONS <br />:4. <br />R <br />T <br />dl <br />I I��i11. <br />0 <br />I <br />(CCR 2635 (8) (5)) <br />V <br />A <br />(CCR 2635 (8) (6)) <br />E <br />L <br />ClrERFILL PROTECTION INSTALLED/APPROVED <br />(CCR 2635 (E) (2)) <br />D <br />S <br />Is. <br />TANK ACCESS PORTS BROUGHT 10 GWE (LOCM MID WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />ITER OR EQUIPMENT INSPECTED <br />DATE <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />%�3 <br />✓IE <br />. <br />1. LIST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />2. LIST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />j�zl Gj� <br />f <br />®,r. 3. <br />INSPECTION AND TEST OF SECONDARY CONTAIMENT: HOLIDAY: <br />I <br />VACJJ(: SOAP: PSI s IN;^ tl t BRINE(LIOUID ANNULAR): OTFER: <br />v/' Ef� 4, <br />PRIKART TANK TEST: P/L' -p-E PSI: /ll3/-f RS 1N; l O <br />8. LAKE TEST ON ALL S.KPS (24 HR. KINIM.RS) HRS: (CCR 2635 (A)) <br />TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />/ /®F <br />I <br />( 6. PRIKARY PIPING TEST (KINIKX 40 PSI/30 KIN) ` (CCR 2635 (8) (4)) <br />($ GI <br />I <br />7. SECONDARY PIPING aX7AINXENT TEST PSI:/a, HRS/i(IN: OTHER: (CCR 2635 (A) (4)) <br />U <br />.3. <br />8. LAKE TEST ON ALL S.KPS (24 HR. KINIM.RS) HRS: (CCR 2635 (A)) <br />(CCR 2632 (A) (2)) <br />9. UNUSED 7ANK OPENINGS SEALED AID CORROSION PROTECTED w (CCR 2635) <br />:4. <br />PERFORNCE TEST OF LINE LEAK DETECTION <br />0. LlrRSPILL PERFORKJ.NCE TEST (CCR 2635 (A) (4)) <br />dl <br />I I��i11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2:35 (B)) <br />FINAL IKSPEC'TION <br />COWENTS: <br />EN23-006 3/92 (REVISED 11\92) <br />s <br />12. <br />PERFOR.KUCE TEST FOR °ALL• W NITORING PROBES <br />(CCR M2 (C) (2)) <br />(�94 <br />.3. <br />PERFORMANCE TEST OF CONT:NlJMM MNITOU NG SYSTD( (PANEL) <br />(CCR 2632 (A) (2)) <br />:4. <br />PERFORNCE TEST OF LINE LEAK DETECTION <br />(CCR 2632 (D) 2635 (8) (5)) <br />.5. <br />PERFORMANCE; TEST OF AUTOKATIC PJP SYSTEM SKJT-OFF <br />(CCR 2635 (8) (5)) <br />.6. <br />BALL FLOAT VALVES INSTALLED <br />(CCR 2635 (8) (6)) <br />7. <br />ClrERFILL PROTECTION INSTALLED/APPROVED <br />(CCR 2635 (E) (2)) <br />.� <br />Is. <br />TANK ACCESS PORTS BROUGHT 10 GWE (LOCM MID WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />19. <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />20. <br />MONITORING PLAN, RESPONSE PLAN AW LOG BOOK 09 SITE <br />(CCR 2632 (E) (1) (2)) <br />"C• FORK C3(PLETED Aho & MITTED <br />(CCR 2635 (E)) <br />NOW170RIWG XETMCA FOR ALL TANKS AJIO PIPING APPROVED <br />(CCR 2641-2604) <br />II <br />ALL CONDITIONS KET; FACILITY PERXIT ISS= <br />(H+S CODE 25254 (E) (F)) <br />COWENTS: <br />EN23-006 3/92 (REVISED 11\92) <br />s <br />