My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_1993-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
6/23/2020 6:50:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1998
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231628_25651 N HWY 99_1993-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />HEEA_TH <br />93 G, -C 20 PM 2: 33 <br />December 16, 1993 <br />Mr. Eric Trevena <br />San Joaquin County Environmental Health <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />r <br />Chevron <br />Chevron <br />Re: Chevron Station #9-2396,25650 Highway 99 North, Acampo, CA <br />Dear Mr. Trevena: <br />Chevron U.S.A. Products Company <br />2410 Camino Ramon <br />San Ramon, CA 94583 <br />P0. Box 5004 <br />San Ramon, CA 94583-0804 <br />Marketing Department <br />Phone 510 842 9500 <br />I am in receipt of the memorandum (December 14, 1993), issued by San Joaquin County Public <br />Health Services (SJCPHS), which describes two items that must be addressed before the tank <br />installation plan for the subject site is approved. In regards to item number 2, Chevron agrees to <br />perform groundwater sampling from the domestic well currently operating onsite. It is understood <br />that the groundwater sampling protocol for this well will be specified by SJCPHS upon review of <br />soil analytical results obtained during the recent tank removal activities. <br />If you have any questions or comments, I can be reached at (510) 842-8695. <br />Sincerely, <br />Brett L. Hunter <br />Environmental Engineer <br />Site Assessment and Remediation <br />CC. Elizabeth Thayer, Central Valley RWQCB, Sacramento, CA <br />Pat Durkin, Chevron USA Products Company, San Ramon, CA <br />Mike Purcell, Chevron USA Products Company, San Ramon, CA <br />Carlos Moore, Chevron USA Products Company, San Ramon, CA <br />Supatra Chowchovech, Robert H. Lee & Assoc., 1137 North McDowell Blvd., <br />Petaluma, CA 94954 <br />
The URL can be used to link to this page
Your browser does not support the video tag.