My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_1993-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
6/23/2020 6:50:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1998
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231628_25651 N HWY 99_1993-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i-- and cetection systems). (Section 2633 (f)] <br />® A. ill in secondary container. [Section 263 ) 1•E) <br />B. 9'"e, <br />space of granular material used as backfil or primary container(s) corplies with Section 2631 <br />(s). [Engineering data to support capacity requirenent]. <br />C. Two or more primary containers within secondary container. (include information on product <br />cocFatibility) <br />D. Secordary container capable of precluding highest anticipated grou"dwater. <br />E. Secondary container sloped to a mmitoring sump from which leakage or precipitation can be detected <br />and re:--aved, <br />® F. Vater tight corner which extends at least a foot beyond each boundary of the secondary container <br />excavation, sloped to drain away from excavation. <br />:�. £ec:ndary containers) thickness, density, cormsition, product compatibility. <br />VA Sized ;o contain u"authori:ed releases from primary containers to allow sufficient time for detection and re-.*val. <br />ISec:ion 2631 (c)] <br />Secondary container(s) volmetrie req.:ire^mnts: [Section 2631 (e) (1) <br />and (2)3 <br />A. single primary containers = 100%. <br />B. Multiple primary containers a 15CX of largest prirary container or 1C% above aggregate. <br />22. FJ //a Secondary container(s) open :o rainfall. [ Section 2631 (f)] <br />volusietric reaJirenents = 24 hours of 100 year storm in addition to primary container volumes. <br />23. Secondary container floor. tSection 2631 (i)] <br />r <br />A. Constructed on firm base. <br />B. Stoped :o collection sump ( 118 inch per fort). <br />(1) One or care access casings installed in su:p. <br />(a) Size to allow reccval of collected liquid. <br />Extended to ground surface. <br />(c) Covered with a locked waterproof cap or <br />within a secured facility. <br />(d) Thickness allows for anticipated stresses. <br />(e) Construction materials are not weakened stored product or will not donate, <br />capture, or mask constituents to be monitored. <br />24. Membrane liner specifications. [Section 2631; k, 1, and N <br />
The URL can be used to link to this page
Your browser does not support the video tag.