Laserfiche WebLink
C) If it is obvious (without doing a precision test) that the product <br />has come from the primary tank, Dispatch will immediately arrange <br />for a tank pumpout and repair/replace activities will begin. In <br />the case of repair, the Tank Test coordinator will handle repair <br />arrangements and precision testing. If replacement is required, <br />the project will be handled by the appropriate zone Engineer. <br />d) If the product in the annular space is water entering the tank <br />from the outer shell, repair/replacement activities will take <br />place as noted in "c" above. <br />e) If it is determined that the liquid in the annular space is water <br />and there are no product losses from the primary tank and no <br />indication of additional water entering the tank, the Tank Test <br />Coordinator will arrange for a precision test of the of the <br />annular space. Based on the results, repair/replacement <br />activities will take place as noted in 00c"' . <br />f) If the Maintenance Mechanic or Contractor is unable to determine <br />how the liquid entered the secondary containment the Tank Test <br />Coordinator will immediately have the appropriate precision tests <br />conducted. <br />g) If it is determined at any time during the process that there has <br />been a release (defined as product leaking from the primary tank <br />to the annular space or water entering the annular space from the <br />backfill), a leak report will be prepared and forwarded to the <br />Marketing Assistant - Compliance. The MA - compliance is <br />responsible for reporting to all regulatory agencies required. In <br />addition, the Tank Test Coordinator will prepare and forward a <br />Fiberglass failure report to headquarters. <br />0 <br />