Laserfiche WebLink
l <br />J <br />New federal regulations require existing underground storage tanks -' <br />be upgraded to meet the new requirements for spill and overflow <br />protection. In addition, all new underground storage tank installations - <br />must comply upon installation. <br />Phil -rite Entoprises The Phil -rite sump cover and spill collector <br />i�ztroduces theirlV�W system meets or exceeds all federal regulations. <br />Phil-tite sump cover & And, the unique design has been engineered <br />spil[ collector unit to provide maximum spill and overflow pro- <br />tection through the use of (up to two) spill <br />collectors and two additional diamond plate Ids, which seal and lock <br />in the assembly. <br />The unit mounts directly over the sump area for easy installation and <br />allows access to the riser cluster. The sump oFening allows a full 36" <br />diameter of clear, unobstructed area to facilitate the removal of the <br />optional lightweight sump shield and access :D the sump area. The <br />sump shield virtually eliminates all surface v,!a:=-r from entering the <br />sump area and has been designed to align w7i1 the sump cover lid. <br />The Phil-tite unit is available in different confic:jrations — <br />from blank top to as many as 4 openings y <br />in any combination. In addition, lid <br />removal is made easy with the special, <br />locking devices provided. <br />For more information on the Phil-tite <br />sump cover and spill collector, <br />call our Redding, GA manufacturing <br />office today: 916/222-801 <br />Pat No. x4,696,330 and other paters appried for <br />: Phil -cite Enterprises <br />2781 Rancho Road - Redding, G4 96002 • 916/222-8015 <br />Fax 916/222-8670 <br />1i <br />