My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_1993-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
6/23/2020 6:50:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1998
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231628_25651 N HWY 99_1993-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />EPA regulations cover Leak Detection, Corrosion Protection, and Spill/Overfill <br />Prevention. The owner is provided compliance options for new and existiwi� <br />tanks and piping systems. <br />New Tank installations have two options: <br />1. Monthly Tank Testing - OR - <br />2. Monthly Inventory Control and Tank Tightness Testing Every 5 years <br />(This option can only be used for 10 years after installation) <br />Existing Tanks have 3 options: <br />1. Monthly Monitoring <br />2. Monthly Inventory Control andAnnual Tank Tightness Testing <br />(This option can only be used until December 1998) - OR - <br />3. Monthly Inventory Control and Tank Tightness Testing Every 5 Years <br />(This option can only be used for 10 years after adding corrosion protection <br />and spill /overfill prevention or until December 1998, whichever date is <br />later) <br />New and Existing Pressurized Piping must provide one of the options from each <br />set: <br />1. Hourly Test Consisting of : Automatic now Restrictor - OR - Automati(4- <br />Shutoff Device - OR - Continuous Alarm System. - AND - <br />2. Annual Line Test - OR - Monthly Line Test <br />Spill/ Overfill Prevention for all Tanks <br />1. Catchment Basins - AND - <br />K. Automatic Shutoff Devices - OR - Overfill Alarms - OR - Ball Flom <br />Valves. <br />Corrosion Protection is not discussed in this presentation. <br />Control Engineers, U.S.A. Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.