My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_1993-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
6/23/2020 6:50:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1998
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231628_25651 N HWY 99_1993-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LJ <br />• the waiting time between the last delivery of product to the underground storage tank <br />and the start of data collection for the test is NA h <br />• the waiting time between the last dispensing of product through the pipeline system <br />and the start of data collection for the test is • 27 h <br />• the total data collection time for the test is .008 h <br />• the volume of the product in the pipeline is less than twice the volume of the product <br />in the pipeline system used in the evaluation, unless separate written justification for <br />testing larger pipeline systems is presented by the manufacturer. concurred with by <br />the evaluator, and attached to this evaluation as Attachment 8 <br />• please give any other limitations specified by the vendor or determined during the <br />evaluation: <br />Disclaimer. This test procedure only addresses the issue of the system's ability to detect leaks in <br />pipelines. It does not test the equipment for safety hazards or assess the operational <br />functionality, reliabiliry or ntaintainabilin, of the equipment. <br />Attaclttttents <br />Attachment 1 - Description of the System Evaluated <br />Attachment 2 - Summary of the Performance of the System Evaluated <br />Attachment 3 - Summary of the Configuration of the Pipeline System(s) Used in the Evaluation <br />Attachment 4 - Data Sheet Summarizing Product Temperature Conditions Used in the Evaluation <br />Attachment 5 - Data Sheet Summarizing the Test Results and the Leak Rates Used in <br />the Evaluation <br />Attachment 6 - Data Sheet Summarizing the Test Results and the Trapped Vapor Tests <br />Attachment 7 - Data Sheet Summarizing the Test Results Used to Check the Relationship <br />Supplied by the Manufacturer for Combining the Signal and Noise <br />I certify that the pipeline leak detection system was operated according to the vendor's <br />instructions. I also certify that the evaluation was performed according. to the procedure <br />specified by the EPA and that the results presented above are those obtained during the <br />evaluation. <br />William D. Glauz <br />(na of on perf rming uadon) <br />(signature) <br />8/07/91 <br />(date <br />816) 753-7600 <br />(telephone number) <br />Pipeline Leak Detection System - Results Form <br />Midwest Research Institute <br />(organization performing evaluation) <br />425 Volker Boulevard <br />(street address) <br />Kansas City, MO 64110 <br />(city, state, zip) <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.