My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_1993-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
6/23/2020 6:50:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1998
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231628_25651 N HWY 99_1993-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />Sensitivity to Trapped Vapor <br />E <br />14. (x) According to the vendor, this system can be used even if trapped vapor is present in the <br />pipeline during a test. (If not excessive) <br />( ) According to the vendor, this system should not be used if trapped vapor is present in the <br />pipeline. <br />15. The sensitivity of this system to trapped vapor is indicated by the test results summarized in <br />Table 2. These tests were conducted at psi with 100 ml of vapor trapped in the <br />line at a pressure of 0 psi. The data and test conditions are reported in Attachment 6. <br />Table 2. Summary of the Results of Trapped Vapor Tests * (approximately 1.5 times operating pressure) <br />Test No. AT <br />CF) <br />Induced Leak Rate <br />(gal/hl <br />Measured Leak Rate <br />(gal/h) <br />1 +8.56 <br />OJO al hr <br />PASS <br />2- +6.23 <br />0.097 gph @ 40 psi <br />FAIL <br />-10.18 <br />0.099 gph @ 40 psi l <br />FAIL <br />Performance Characteristics of the Instrumentation <br />16. State below the performance characteristics of the primary measurement system(s) used to <br />collect the data. (Please specify the units, for example, gallons. inches.) <br />Quantity Measured: Pressure (psi) Volume (ml) Time (sec) <br />Resolution: 0.1 0.5 0.01 <br />Precision: 0.1 0.5 0.05 <br />Accuracy: <br />0.3 1.0 0.01 <br />Mirlinaurn Detectable Quantity: . 0 - 1 1.0 0.01 <br />Response Time: -- <br />Threshold is exceeded when the flow rate due to a leak exceeds 0.05 gal/h. <br />Application of the System <br />17. This leak detection system is intended to test pipeline systems that are associated with <br />underground storage tank facilities, that contain petroleum or otheri chemical products, that <br />are typically constructed of fiberglass or steel, and that typically measure 2 in. in diameter <br />and 200 ft or less in length. The performance estimates are valid when: <br />• the system that was evaluated has not been substantially changed by subsequent <br />modifications <br />• the manufacturer's instructions for using the system are followed <br />• a mechanical line leak detector System has a 3 gph test mode, whose <br />( )is present in function replaces that of a mechanical <br />(X) has been removed from I line leak detector. <br />the pipeline (check both if appropriate) <br />Pipeline Leak Detection System - Results Form Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.