My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_2003-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
6/23/2020 6:50:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2012
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231628_25651 N HWY 99_2003-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> TANKS <br /> UNDERGROUND STORAGE TANKS-INSTALLATION <br /> CERTIFICATE OF COMPLIANCE (one page per tank) <br /> Page of <br /> L FACILITY IDENTIFICATION <br /> BUSINESS NAME(Same as FACIL]TY NAME or DBA-Doing Business As) 3 <br /> S.M.K. CHEVRON <br /> ADDRESS 00r local use ony) 496 <br /> 25651 N 99 W FRONTAGE RD,ACAMPO,CA 95220-9235 <br /> FACILITY ID# t TANK ID# 4n <br /> Tank No.1 <br /> H.INSTALLATION <br /> (Check all that apply) <br /> 4� <br /> ® The installer has been trained and certified by the tank and piping manufacturers. <br /> ❑ The installation has been inspected and certified by a registered professional engineer having education and experience 479 <br /> with underground storage tank installations. <br /> 480 <br /> ® The installation has been inspected and approved by the Unified Program Agency. <br /> 487 <br /> ® All work listed on the manufacturer's installation checklist has been completed. <br /> 482 <br /> ® The installer has been certified or licensed by the Contractors'State License Board. <br /> ® The underground storage tank,any primary piping,and secondary containment was installed according to applicable 463 <br /> voluntary consensus standards and written manufacturer's installation procedures. <br /> Description of work being certified: <br /> UPGRADE EXISTING TANK FILL SYSTEMS. <br /> INSTALL NEW DISPENSERS ON EXISTING CONTAINMENT. u <br /> ON\lRGNA SE.i��1GES <br /> PERM 1 <br /> III. TANK OWNER/AGENT SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNATURE OF TANK O ER/AGE DATE 484 <br /> i �- ;?- 2- ® ? <br /> NAME OF TANK OWNER/AGENT(print) 485 TITLE OF TANK OWNER/AGENT 486 <br /> HARVINDER PAL SINGH OWNER <br /> UPCF(1/99 revised) 14 Formerly SWRCB Form C <br />
The URL can be used to link to this page
Your browser does not support the video tag.