Laserfiche WebLink
MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONI PORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> 1.CONTINUOUS ELECTRONIC MONITORING El2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 496-54b <br /> ❑4.NO DISPENSERS 099.OTHER(5 ecify) <br /> PANEL MANUFACTURER: goo-r -- 496-ss MODEL#: G...5 3SO 490-%. <br /> LEAK SENSOR MANUFACTURER E l �L 4' I� 49457 MODEL#(S): 7�3�� --'20� 490 sa <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS fm a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN W a.YES ❑b.NO 490'60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 10 a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER f? a.YES ❑b.NO 4 <br /> 2.UDC CONSTRUCTION IS L SINGLE-WALLED 2.DOUBLE-WALLED 49063 <br /> IF DOUBLE WALLED: J� y <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: I"I'T UID 2.PRESSURE 0 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ffia.YES ❑b.NO 4 <br /> VII.PERIODIC SYST"TESTING <br /> I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTI N LgLDJ MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 496.66 <br /> SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br /> VIII.RECORD1=PING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 49o-6aa ❑Visual Inspection Records 490.68b ®,Tank integrity testing results 490-6& <br /> SIR testing results(and supporting documentation records). 49o-adTank gauging results(and supporting documentation records). 490. e <br /> ❑ATG Testing results(and supporting documentation records).490-68f 0 6aCorrosion Protection 60-day logs 490-as <br /> ,Equipment maintenance and calibration records. 490-6sh <br /> IX.tkONING <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> 19 THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490.6 <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69e <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4WW <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49o.69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> JA This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Pian <br /> ➢ Names of contact person(s)for emergencies and monitoring slams.490.7o <br /> X. CONIlk MMADDITIONAL INFORMATION _ <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this pl*49 ) <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The follow 'n rson s)are rets nsible r pe rnting the onitoring and equipment maintenance: <br /> NAME /��/i1`/ f 490-72 TITLE inL � 490-73 <br /> NAME 490-74 TITLE 490_75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OVVNERdOPERATOR SiGNAT'URE <br /> CERTIFICA'T'ION:I certify that the information pro ided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490_76 DATE: V 490-77 <br /> yvile� <br /> R NTtNE, .Tank(huger/ 731737 2..FadjjLyOx neel0 ntM0 1 AuthW&WR sentativ of <br /> APPLICANT NAME(Pont): � (� / � 496-78 APPLICANT TITLE: ©/G, �_� 490.79 <br /> QCs(AS <br /> -�2- U <br /> UPCF UST-D(12/2007)3/4 / <br />