Laserfiche WebLink
EA <br />0 #RECEIVED <br />JUL January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containnd <br />printouts from tests (tf applicable), should be provided to the facility owner/operator for su mina t agency. <br />1. FACILITY INFORMATION <br />Facility Name: COLLIER CHEVRON Date of Testing: 06-12-14 <br />Facility Address: 25651 N HWY 99 ACAMPO CA <br />Facility Contact: TONY Phone: 209-333-0305 <br />Date Local Agency Was Notified of Testing :05-29-14 <br />Name of Local Agency Inspector (f present during testing): ARIS - SAN JOAQUIN CO <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: TAPE / <br />H2O Equipment Resolution: 1/16 <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />Bucket Installation Type: <br />1 87 2 91 <br />❑ Direct Bury ❑ Direct Bury <br />®Contained in Sump ®Contained in Sump <br />3 DIE <br />❑ Direct Bury <br />® Contained in <br />SUMP <br />4 <br />❑ Direct Bury <br />El Contained in <br />Sum <br />Bucket Diameter: <br />11 11 <br />11 <br />Bucket Depth: <br />13 13 <br />13 <br />Wait time between applying <br />vacuum/water and start of test: <br />Test Start Time (TI): <br />1245 1245 <br />1245 <br />Initial Reading (Ri): <br />12 12 <br />12 <br />Test End Time (TF): <br />1345 1345 <br />1345 <br />Final Reading (RF): <br />12 12 <br />12 <br />Test Duration (TF — TI): <br />1 HOUR 1 HOUR <br />1 HOUR <br />Change in Reading (RF - RI): <br />0 0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />® Pass ❑ Fail ® Pass ❑ Fail <br />[D Pass [—]Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />PHIL TITS BUCKETS <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: Date:06-12-14 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />