My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
6/23/2020 6:50:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231628_25651 N HWY 99_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />` ifthe entire depth of the sump is not tested, specify how much was tested. 1f the answer to m of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG- <br />Page <br />SWRCB, january 2002 <br />IPING <br />�. ESTING <br />__. <br />Test Method Developed By: <br />`((Manufacturer <br />_..�_ . .I <br />0 Sump <br />__..., <br />, . <br />01 Industry Standard 'Y <br />Test Method Used: <br />0 Pressure <br />0 Vacuum <br />Flyarostatic <br />l <br />3 <br />Test Equipment Used: Caldwell Level C Indicator <br />j7-- YCa);' ua 'ii j �"�✓�2 <br />.,. KY���\'?.\\,\:"'R�-,:�,-^'§Y4�`,..riaL>�.S <br />qu prn , ent ReSolufi=77IJ2 <br />C k� \! 3 1 <br />�� .v` ^`�i.`g� \ �\h.`".C."''�^.3b�:"J, <br />—M���_h�� <br />tK <br />1 � Ilb <br />Sump Diameter: <br />Sump Depth: <br />kHeight <br />from Tank Top to Lo e <br />Electrical Penetration: <br />7ond—ition of sump A i. to testing* <br />II I I II IIII I III U � <br />; <br />t <br />I <br />� <br />—�ortion of Sump <br />Water Level 2 <br />Water Level 21Y' <br />KIM= <br />,il. ! �i turbine m i� shut d oi �M � ien <br />sump sensor .te <br />Turbine shutdown response time <br />Not Alarmed <br />i i�si iso <br />i <br />onerationalf <br />Wait time tween applying <br />waterand <br />starting test: <br />i <br />a <br />w <br />Reading <br />j II <br />3 <br />£ <br />! I!!005/30 <br />y <br />�. <br />�ff�lf����,��°�IIIIIIII IIUIIII �I�IIII� I�� <br />-------------- <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />` ifthe entire depth of the sump is not tested, specify how much was tested. 1f the answer to m of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG- <br />
The URL can be used to link to this page
Your browser does not support the video tag.