Laserfiche WebLink
08/18/2013 11:35AN FAX 2093330318 RSH CORP 003/0006 <br />D. ResuBs of Testing/Servicing <br />Software Versim Installed: 329.00 <br />ranrerntw Nan 9MUsw4nn rhwn4n®th <br />® Yes <br />(3 <br />Ne <br />1e the audible $farm I? <br />0 Yos <br />0 <br />No, <br />Is the" vlsuai alarm oprratlonsl? <br />0 Yea <br />❑ <br />NO, <br />Were all sonsors visually Inspected. functionally testa!, and conifrmred operational? <br />ED Yes <br />i*I <br />No" <br />Were an sonsors Installed at lowest pant of secondary containment and pdsitioned so that other equiprnaIrt will not Interfere with twr proper <br />r$tigh? <br />❑ Yea <br />❑ <br />No° <br />p alarms aro relayed to a remota monitoring station, is all ccmmunioationo equipment (e.g., ) nal? <br />® <br />NIA <br />® Yes <br />❑ <br />No, <br />For prewrized piping systems, does the tudDine vulornallically shut down it the piping secondary containment monitoring system de a Irak, <br />❑ <br />WA <br />fails to operate, or is electrically disconnected? if yes: which serisoPa Mate positive shut-down9 (Cftck all that ceryl ® Su p/Trench <br />Sensors; IS Dispenser Containment Sensors, <br />W you confirm =ve shut -down duo to !oaks aW sensor failureldisoonnedon? ® Yrs: p No. <br />Q Yea <br />❑ <br />No` <br />For tank syatams that utilize the monitoring system as the primary tank overfill warning device (i.e.. no mechanical Overfill Vv4enWn valve is <br />WA <br />instar), is the overfill warning alarm vlsitge and audible at the tank fill point(a) and Operating properto it so, at what percent of tank capacity <br />does the alarm trigger? % <br />❑ Yes <br />>$l <br />No <br />W$$ any monitoring equipment mptaced? N yes, Won* specift sensors, iX , or Mor equipment replaced and list the manufault rer name <br />and mel for all replacement parts in $aOon E, Dalow. <br />®Yes" <br />® <br />No <br />Was liquid found insxie any Secondary containment systems designed as dry systema? aN deaf apply) <br />® Product; Li . it yes, Oescribe causes in Section E, mow. <br />Q Yes <br />❑ <br />Ne <br />Was mone0onng system $at ap reviewed to ensure proper figs? Attach sed up reports, if applicable <br />0 Yes <br />❑ <br />No' <br />is all monRoring equipment operational per marluMeturer's s gwrs? <br />• to Sanction E brlOw, describe how and When tNmo deficiencies were or will be corrected. <br />E. Commreft: <br />monitortng System Cortifielsoon Page 2 of 4 <br />