Laserfiche WebLink
06/18/2013 11:36AM FAX 2093330318 KSN CORP 0005/0006 <br />16 <br />Modlitor,ing System Cam fte"on <br />UST Monitoring US Plan <br />Site Addmss: COLLIER RD CHEVRON 26651 N HWY 99 AC PO CA 95220 <br />.............0 <br />...... <br />............ ...... ....... <br />. _ i0p <br />. . . . . . . . . . * . . . . . . . . . . . . <br />... E -STOP, <br />............ ....... — ............ <br />.......... ....... ....... <br />....... ...... ....... <br />........... ....... ...... ....... <br />........... ......... 11.1 ...... I'll ....... ...... <br />.......... ...... ......... <br />.......... I . � I 0 ....... <br />............ ........ <br />........... <br />.. ......... <br />.......... ......C <br />...... <br />...... ...... ...... A-ANNULAH <br />.111, ....... .....F-FIIJ. <br />.......... ...... <br />sato map was drawn: WIVI I <br />V-VAil()R <br />P rROUE <br />'1'-'[I,JRBINE <br />. . . . . . L PILLD <br />qFMR LCION <br />.......... <br />...... NTS— <br />if you already I" a diagram that shows all required ifflormation, you may include it, rather than tinis pop, y4th your Monitoring System Certification, 01 <br />show die general layout d tanks and piping. Clearly identify locations of the following equipment It Installed: monitoring system control panels; sensors I <br />armularspa=, sumps, dispenser pans, soil containors, or other secondary containment Stan: mechanical or electronic line leak latectori: and Inotank <br />probes (VT used for leak dettictlon), In the space provided, note the daft this Site Plan was prepared, <br />itsite plan, <br />Kong tank <br />Id level <br />Mwistoring system C0*15cation Page 4 of 4 1 2/21 /07 <br />37 <br />91 <br />DWI <br />%A <br />Q -P <br />@A <br />r V <br />x <br />2A <br />sato map was drawn: WIVI I <br />V-VAil()R <br />P rROUE <br />'1'-'[I,JRBINE <br />. . . . . . L PILLD <br />qFMR LCION <br />.......... <br />...... NTS— <br />if you already I" a diagram that shows all required ifflormation, you may include it, rather than tinis pop, y4th your Monitoring System Certification, 01 <br />show die general layout d tanks and piping. Clearly identify locations of the following equipment It Installed: monitoring system control panels; sensors I <br />armularspa=, sumps, dispenser pans, soil containors, or other secondary containment Stan: mechanical or electronic line leak latectori: and Inotank <br />probes (VT used for leak dettictlon), In the space provided, note the daft this Site Plan was prepared, <br />itsite plan, <br />Kong tank <br />Id level <br />Mwistoring system C0*15cation Page 4 of 4 1 2/21 /07 <br />