Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: COLLIER RD CHEVRON 26661 N HWY 99 ACAMPO CA 96220 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> *PIPING* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> (ARROWS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Drawing of . . . . . . . x . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> piping exit of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> sumpand UDC's. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . <br /> No underground . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-STORoE. . . <br /> drawing is . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> accurate,we . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> cannot speculate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> blue prints. <br /> . . . . . . . . . . . . . . . . . . . . . . x . . . . . . . . . . . . . . . . . . . . . . . . <br /> xx . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . KEY <br /> . . . . . . . . . . . . . . . . . . . . A=ANNULAR <br /> . . . . . . . . . . . F=FILLS <br /> X . . . . . . . . . . . . T=TURBINE <br /> . . . . . . . . . . P=PROBE <br /> . . . . . . . . . . . . V=VAPOR <br /> . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> x . . . . . . . . . . . . . L=Leak Detector <br /> . . . . . . . . . . . . . M=Manway <br /> B=Brine Sensor <br /> I=Smart Sensor <br /> X L S=STP <br /> . . . . . . . . . . . . . . . . X X C=Floats&Chains <br /> L E=E Stop <br /> L . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . <br /> 87 . . . . . . . . . . . . . . . . . . . . . . . . <br /> 91 DIE <br /> . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> . 2@ @ <br /> VENTS . <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing <br /> )AO <br /> not to scale <br /> Date map was drawn: 6-7-2016 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Cleary identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />