Laserfiche WebLink
JUN 2 9 2016 <br /> January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name: COLLIER CHEVRON Date of Testing: 6-7-2016 <br /> Facility Address: 25651 N HWY 99 ACAMPO, CA 95220 <br /> Facility Contact: TONY Phone: <br /> Date Local Agency Was Notified of Testing: 5/23/16 <br /> Name of Local Agency Inspector(if present during testing): ARTS <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 2nd Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑Lyle D.Nimmo Zane A.Nimmo X David A.Winkler ❑ Felix G.Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': ®ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ®Hydrostatic ❑Vacuum ❑ Other <br /> Test Equipment Used: TAPE MEASURE, H2O Equipment Resolution: 1/16" <br /> Identify Spill Bucket(By Tank 1 87 2 3 91 4 DIESEL <br /> Number, Stored Product, etc.) <br /> ❑Direct Bury ❑Direct Bury ❑Direct Bury ❑Direct Bury <br /> Bucket Installation Type: ® Contained in ®Contained in <br /> ®Contained in Sump ❑Contained in Sump Sump Sump <br /> Bucket Diameter: I 1 11 1 I <br /> Bucket Depth: 12 1/2 13 1/2 12 3/4 <br /> Wait time between applying _ <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 9 9 9 <br /> Initial Reading(Ri): 11 5/8 12 1/4 11 5/8 <br /> Test End Time(TF): 10 10 10 <br /> Final Reading(RF): 11 5/8 12 1/4 11 5/8 <br /> Test Duration(TF—TI): HR HR HR HR <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> ` y fav' ,, ,' Pass s' ❑latl `r r3' I+'al " ss ®Tari <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ALL 3 BUCKETS PASSED BUT DO NOT HOLD 5 GAL SO SITE GOT <br /> TO PUT 5 GAL BUCKETS ASAP . ELITE WILL DO <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature . W Date: 6-7-2016 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />