Laserfiche WebLink
0 0 <br /> SPONSE PLAN --PAGE 1 (One form per facility) <br /> TYP70FACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME ame as FACILITY N ME) Rot. <br /> Kgm A,% ct M r, V <br /> BUSINESS SITE ADDRESS �� R03. <br /> ,��' 6..5"f �• 4 / 49� CITY44C t7 1�2 2 0 oa. <br /> II.; SPILL CONTROL CLEARUP METHODS <br /> This pian addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> A Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days;or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> A We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-IJP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete ly if applicable) <br /> EQUIPMENT LOCATION y_JaeAVAILABILITY �p <br /> SDA f- RIO. C K RZO 1 f//6-� R30. <br /> R11. R21. <br /> R31. <br /> 1112. R22. R32. <br /> R13. R23. <br /> R33. <br /> R14. R24. <br /> R34. <br /> R15. R25. <br /> R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLO ING PERSON(S)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME ' V )MD M f9 r,14 R40. TITLE o` 1� � R50. <br /> NAME R41. TITLE R51. <br /> NAME R42. TITLE R52. <br /> NAME R43- TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> T Additional system testing or data collection %Inspection by qualified persons ❑Recalibration of equipment <br /> Other: <br /> R60. <br /> UST Response Plan(3/2008)-1/3 <br />