Laserfiche WebLink
Monitoring System Certification <br />LIST nfto Plan <br />site Address: 2551 E Louise Ave., Lathrop, CA 95330 <br />Building <br />Transition Surnp <br />LS 600 Sensor <br />... Pnuem <br />TMS2 <br />Train Tracks I <br />I Generator <br />Enclosure <br />I <br />I <br />RAz00 ren <br />Apprwcimete <br />Piping Location In -tank Gauging Probe <br />µQp I MS 450 <br />toip <br />600 Surso <br />5 LS 600 Sensor <br />O <br />Ap proxirnate Vent 0 4 Annular <br />Line Location LS 610 SensOr <br />Spall Budd <br />550 Gallon Diesel Tank <br />Gate <br />Date map was tet. 4 /18 /18 <br />If you already have a diagram that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification. On your plan, show the general layout of the tanks and piping. <br />Clearly identify locations of the following equipment, if installed: monitoring system control panel; sensor <br />monitoring tank annular spaces, sums, dispenser pans, spill containers, or other secondary containment areas; <br />n=hanical or electronic line leak detectors; and in -tank liquid level p (if used for leak detection). In the <br />space provided,note the date this plan was prepared <br />