Laserfiche WebLink
Asa <br />'RECEIVED <br />Monitoring System Certification <br />APR 2 7 2017 <br />UST WWtoring Plan ENVROW&WAL WURLM <br />site Address: 2551 E Louise Ave., Lathrop, CA 95330 PEMAMSERWXES <br />Building <br />Transition Sump <br />LS 600 Sensor <br />Priuerrilc4lor <br />TMS 2" <br />Train Tracks <br />Generator <br />Enclosure <br />RA200 rfill <br />Fq3ing In -tank Gauging Probe <br />NIS 450 <br />W Piping SurnP <br />__ Q <br />�-�: E LO0. LS 600 Sensor <br />-- <br />O <br />Approximate vent I 4 Annular <br />Una Location LS 610 Sensor <br />Spill Bucket I <br />500 Gallon Diesel Tank <br />E El� <br />Gate <br />-4 <br />4= - <br />We imp was dra, wn: 4 /19 /A 7 <br />Instructions <br />If you already have a diagram that shows all required infon-nation, you may include it, rather than this page, <br />with your Monitoring System CertificatiorL On your plan, show the general layout of the tanks and piping. <br />Clearly identify locations of the following equipment, if installed: monitoring system control panel; sensor <br />monitoring tai* annular spaces, sumps, dispenser pans, spill containers, or other secondary contairnT=t areas; <br />mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this plan was prepared. <br />