Laserfiche WebLink
EMMUNIAki1 1'1 I ' <br />, ! ' • 1 1 1 <br />f1ki fit I W441114 1, <br />1! ! 1i 'ilgi <br />'il <br />1-2M SERIES <br />Fmbh&aeAWF=1 <br />L <br />Figure I/Figura 1 <br />step 1 <br />Set riser pipe. "b" is the distance between the top of the riser pipe <br />and finish grade. Deburrriserpipe. <br />Step 2 <br />Apply pipe dope to riser threads. <br />Step 3 <br />Install spill container by rotating the mounting ring until <br />hand tight. <br />Nott Do not attempt to completely tighten the coxtahw <br />by us&g the monalng ring <br />Step 4 <br />Finish tightening the spill container with a pipe wrench on <br />tower octagon shaped area. Torque to 250 ft lbs. maximum. <br />Step 5 <br />Install pipe nipple per Figure 2. For standard coyer models, <br />install adapter and tight fill cap. For sealable cower ('SC) models, <br />install a standard 4" pipe cap to support adjustment system. <br />(Adapter and tight fill cap must be installed in sealable coyer <br />(SC) models after concrete has dried.) <br />Step 6 <br />Install adjusting system beneath tabs on mounting ring. <br />See Figure 3 for standard coyer models - see Figure 4 for sealable <br />coyer models. Add shims as needed and adjust with screw. <br />(Shuns must be cut to size for sealable coyer models) The <br />height can be increased up to 1" (2.5em). <br />Notes The a*wbxext sbould rot be more than <br />1 " (23 cm) from the WW lengtb of the unit. <br />%* <br />1-2100 15' (38on) <br />1-2100E 21" (53cm) <br />(Deepp Bd m Modeh) <br />(Modebs (on Foelbs Pr ) <br />1.2400 16' (41 cm) <br />1-2115 20" (51 on) <br />'Subtract 2- (5cm) from 'V for <br />cast iron base models <br />'Reste 2" (5cm) de la "I." en los <br />modelos con base de hierro. <br />Paso x <br />Determine el later conecto del tubo de descarga del t roque. "L" es la <br />disaanda entre la parte superior del tubo del tanque y d sudo. Remueya <br />las wbabas del tubo de descarga del tanque. <br />Paso 2 <br />Aplique sellador de tubos a los enrosques del tubo de descarga <br />del taague. <br />Paso <br />Instate el comenedor de derrames rotando el anillo de montaje <br />con la nano hasm que este firme. <br />Nota: No trate de apr~por completo ed contenedor usaxdo <br />el wrM de momaja <br />Paso 4 <br />Termine de apretar et com enedor de denames con turd live para tubedas <br />en et area inferior oun forma octogonal. to fuerra maxima de enrosque es <br />250 pie4lbra. <br />Paso <br />Instate el niple del tubo de aawrdo a h figura 2. Pard cubierW <br />comunes, instale adaptador y tapa de llenado. Para cubiertas sellables, <br />(SC) fnsuk una taps de tubo de 4" ago soporte del sistema de aluste. <br />M adaptador y la tapa de llenado de -ben ser ftmalados en la cublena <br />sellable (SGS despues de secarse el honnigt & <br />Paso 6 <br />Inscale ajus<ando el sistema por debajo de las proyecdones del awHo <br />de montaje y taps. Vea la figura 3 para cubiertas comunes y la figura 4 para <br />cubiertas sellabies. Agmegue los espadadores necesados y ajuste con tornii- <br />Io. (Los espaciadores deben ser commlos a medida cuando se user cmr <br />cubler ms settables.) Se puede aumentar la attura h2sm 1" (2.5 cm). <br />Nota: El ajuste ao puede exceder 1"(2.S cm) a partir de la <br />kxgftud inictal de la unidad <br />