Laserfiche WebLink
SWRCB, January 2002 <br />Ttst Method Developed By: <br />Test Method Used: <br />Test Equipment Used: 1N .0 <br />Sump Diameter: <br />Sump Depth: <br />Sump Material: <br />sleight fxom Tank Top to Top of <br />Highest Piyin-R Penetration: <br />Height from Wank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />pxoduct_and wuteryt' <br />Turbine shutdown responso time <br />is system programmed for fail-sa <br />to <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading <br />Test JDWation: <br />Change in Reading (RF -Ra): <br />Pass/Fail Threshold or Criteria: <br />Test Result_ _ <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />6. PRgN G SUAP T7ESTINO <br />Sump Manufacturer Industry Standard <br />Other (.specify) <br />Pressure Vacuum <br />Mar (Specify) <br /># 1 Sump # Sump 9 <br />dee t�/t �r <br />10 e i Osr <br />X14 y1r <br />Page of <br />Professional Etxgineer <br />Resolution: <br />Yes No FA) Yes No Q Yes No NA <br />171 <br />1 <br />Yes No Yes No 1 Yes No NA Yes No NA <br />Yes No Yat No Yes No NA Yes No NA <br />0 <br />0 Pass 0 F61 <br />Yes No _ NA <br />Yes No NA <br />j If the entire depth of the sump is not tested, specify how much was tested. If the answer to OX of the questions indicated with an <br />asterisk (*) is "NO" or "NA', the entire sump trust be tested. (See SWRCB LG -160) <br />6i6'd 0821ON 00 1100S Wd9ti:TT E002'6 'Ndl <br />Ct <br />15d..,g., <br />t �w s.► <br />-.14-10 <br />ra C%d t <br />--q ou'�F" <br />.. Do 2r- <br />0 ]Fags <br />sial >r Pass CJ li aii O Paigl; 0 F$il <br />o <br />NA n No NA Yes No <br />NA <br />No <br />NA es No NA Yes No <br />NA <br />on repairs made <br />prior do gestin and recommcndddfollo!tu <br />or ail <br />S...,` <br />P6 <br />0 Pass 0 F61 <br />Yes No _ NA <br />Yes No NA <br />j If the entire depth of the sump is not tested, specify how much was tested. If the answer to OX of the questions indicated with an <br />asterisk (*) is "NO" or "NA', the entire sump trust be tested. (See SWRCB LG -160) <br />6i6'd 0821ON 00 1100S Wd9ti:TT E002'6 'Ndl <br />