Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed BY: <br />Test Method Used. <br />Page — of <br />5. S19CONDARY PIPE ME& <br />Piping Manufacturer dtistry Standar Professional Engineer <br />OtherIfy) <br />(fressuro) Vacuum Hydrostatic <br />Test Equipm®ut Used: 0 <br />Equipment Resolution: <br />M!!11 til :,.,1 ii <br />al <br />Piping Rung 1 Piping Rung "0- Piping Run # Piping Run # <br />Piping Matc-rial: <br />Piping Manufadurer: <br />Piping Diatleter: <br />Length of Piping Run: <br />Product Stored. <br />Method and location of <br />pip in -ran isolation: <br />Wait time between applying <br />1 <br />pressurelvwUuM/water and <br />0 0 <br />stattiti test: <br />Test Start Tanc: <br />13u 1 <br />Initial Readi-ag (F,,): <br />Test End Time- <br />Vinal Reading (RF): <br />Test Duration: <br />ClMge in Reading (Rp-N: <br />C) <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result <br />1 -6 <br />Fuss Ij Fail )rPass 0 Fail 0 Pass r] VAil <br />L -,, I <br />le, ts <br />ow�;u _5L?,f ds <br />Comment$ — include information on re its made prior to tesfing, and recommended All pf <br />ko ir <br />6/sId 082'ON 00 1103S wu9T:TT 6002'6 'Nur <br />