Laserfiche WebLink
I <br />Number of Panes <br />INSTRUCTIONS TO BIDDERS 2 <br />SCHEDULE OF DRAWINGS <br />GENERAL CONDITIONS OF BUILDING CONSTRUCTION CONTRACT <br />ORDER OF PROCEEDURE <br />SPECIFICATIONS <br />DIVISION I W.EERAL REQUIRE14ENTS <br />IA Special Provisions <br />IS Order of Procedure <br />DIVISION 2 SITE WORK <br />CIA Removal, Backfill & Paving <br />Attachments * 2 and 3 <br />DIVISION 3 QMRETE <br />3A Concrete <br />DIVISION 4 MASONRY <br />(romw in this contract) <br />DIVISION 5 METALS <br />(none in this contract) <br />DIVISION 6 GORPENTRY <br />(Norm in this contra <br />DIVISION 7 PIDISTILR_E CONTROL <br />(None in this contr <br />DIVISION 8 -- DOORS, WINDOWS AM %AS91 <br />DIVISION 9 FINISHES <br />(None in this Contract) <br />DIVISION 10 SPECIALTIES <br />(Norm in this contra <br />DIVISION 11 gMIPNENT <br />(None in this contr] <br />DIVISION 12 E M I9HINSS <br />(None in this contract) <br />I <br />IN <br />H <br />q <br />a <br />Spec B56K482 TABLE OF CONTENTS <br />Page I of 2 <br />