My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELM"I9 <br />l m 11i I ` 1 i ` <br />•meansCommunications, <br />"Engirwern means Robert H. <br />Ahearn, Y CommunicationQ <br />authorized Engineer, or its authorized represen ativen <br />"Work* means the mWork to be DoneO as hereinafter <br />described. <br />"Dramines" means all drawings covering the work to be done <br />and furnished either with this specification <br />Engineer. <br />The work consists of complete removal of four underground <br />18,000 galloncapacity fuel• s appurtances <br />outsi l <br />the building at the Lodi Radio Relay Building, JIIO W. Tu <br />Rd. i.iCalifornia. <br />This specification is of the abbroviatedg simplified type and <br />includes incomplete sentences Omission of words or phrases <br />such as "the contractor conformity <br />nshall be". was noted on the drawingsu., win accordance with <br />details",, maw, ffianoj "them, and nallm are intentional. <br />Omitted phrases <br />same manner as they are when a note occurs on the drawings. <br />.i <br />specification .' herewith, he shall <br />deliver his question. to the Engineer <br />receive from the Engineer a written answer. The written <br />question <br />Ml. . Canswer <br />be .?l bidders ... <br />opinion of Engineer the question concerns an error or <br />uncertainty in this specification or the drawings. <br />tb. NeitherAT&T orEngineer northeiri _ .. ... be <br />bound • . or responsible <br />fororal answersif, <br />inquiriesor ■ oral statements regarding <br />specification, the drawings, or the work to be done. <br />Spec B56K482 INSTRUCTIONS TU BIDDERS <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.