My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gau&g SIR Equip=crzt: kheck this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging; equjiment is used to perform leak detection monitoring. <br />rnmniato the ranowinsi checIdW: <br />itry and termination® including testing for ground faults? <br />for damage and residue buildup? <br />tested? <br />maintenance checklist completed? <br />In the Section H, below, describe how and when these i deficimcies were or will be corrected. <br />G. Line Leak Detmtors OLLD): Check O)jj box if LLDs are not installed. <br />rwi-,-r, nlete the .til 1, checklist: <br />all that apply) Simulated le4 �raw: LI 3 g.p.h.; U 0. 1 g.p.h 13 0.2 g.p-h <br />4 <br />JL■Wgjzn2r' <br />=T <br />itry and termination® including testing for ground faults? <br />for damage and residue buildup? <br />tested? <br />maintenance checklist completed? <br />In the Section H, below, describe how and when these i deficimcies were or will be corrected. <br />G. Line Leak Detmtors OLLD): Check O)jj box if LLDs are not installed. <br />rwi-,-r, nlete the .til 1, checklist: <br />In the Section H, below, describe how Rna wnen UM VW OCILIcTucBm wct c uj' w M "'V, a -M& <br />H. Conments: <br />Page 3 of 3 0"1 <br />2T/TT'd M72e9t7:01 96)-T-7253-602 9NIiSM"dwoo,ismwojA 22;eT S002-eT--inf <br />all that apply) Simulated le4 �raw: LI 3 g.p.h.; U 0. 1 g.p.h 13 0.2 g.p-h <br />(Che�ck <br />d <br />i For mechanical LLDs, does the LLD'I restrictilproduct flow if it detects a leak? <br />a <br />electronic LIDs, does the turbin� automiltically shut off if the LLD detects a leak? <br />For electronic ARDS,doCSTIc 'JLok WIT., <br />or disconnected? W1 <br />or electronic LJ -Ds, does the turbine automatz'Myslfflut on ir any puTuvu UL 11 WIVITMILLI&r"L <br />or Nis a test? <br />For electronic LLDs, have al ess I ible witing co;��tions been visually inspected?■ <br />I II.Ropell UglLgul) 11 1 um its oil t[Vi"49 V -*MJ 'Ad I b i <br />In the Section H, below, describe how Rna wnen UM VW OCILIcTucBm wct c uj' w M "'V, a -M& <br />H. Conments: <br />Page 3 of 3 0"1 <br />2T/TT'd M72e9t7:01 96)-T-7253-602 9NIiSM"dwoo,ismwojA 22;eT S002-eT--inf <br />
The URL can be used to link to this page
Your browser does not support the video tag.